This guide explains how to create and manage runsheet jobs and runsheets, including how special calendar days affect scheduling.
What’s new?
With the introduction of Calendar Functions, the UI provides a simplified and structured flow for configuring runsheet jobs and full runsheets.
See the detailed instructions below.
How to create a runsheet job
Step 1: Navigate to Schedule Template
Go to: Site → Mobile Dispatch → Schedule Template.
Step 2: Create a new job
Click +Schedule job type to begin creating a job.
Step 3: Enter job details
Fill in all required fields in the Details tab, then continue to the Schedule tab.
Step 4: Enter the job schedule
Specify day‑by‑day scheduling and click Next.
Step 5: Add special calendar days (optional)
You can attach special day rules to this job:
- Click + to add a special day type.
- Add multiple special day rules if needed.
Select how special days should affect the job:
- Implement based on schedule — overrides normal schedule times with special‑day timings.
- Do not implement — job is skipped on the special day.
- Implement based on holiday — job runs only on designated holidays/weekends.
Step 6: Save
Click Save to finalize the job.
Viewing special days added to a job
To view the special days configured for a specific job:
- Click the job icon in the calendar view.
- Open the Time Adjustment tab in the right panel.
Editing, canceling, or adding more special days to a job
- Click the "i" icon in the calendar view.
- Use the pen icon to edit.
- Select Add day type to add more special days.
- Use Cancel to cancel the job.
How to create a runsheet
Step 1: Navigate to Runsheets
Go to: Zone → Run Sheets → Run Sheets tab.
Step 2: Create a new runsheet
Click +Create runsheets.
Step 3: Enter runsheet details
Complete the form and click Next.
Step 4: Add special calendar days (optional)
As with jobs, you may add multiple special day types and define how they affect the runsheet schedule:
- Implement based on schedule
- Do not implement
- Implement based on holiday
Step 5: Save the runsheet
Click Save.
Viewing special days added to a runsheet
- Open Details of the runsheet.
- Go to the Time Adjustment tab.
Editing or adding more special days to a runsheet
- Open Details of the runsheet.
- Click the pen icon to edit.
- Select Add day type to include additional special days.